How 4–20 mA Scaling Works
适用场景
Use this guide when loops read correctly at the transmitter but HMI numbers disagree because span and zero were never written down.
要使用的工具
Browser-based preliminary check for Four Twenty MA Converter — fast estimates, not code or stamped design output.
打开 Four Twenty MA Converter →步骤
- 1Confirm whether 4 mA represents live zero or indicates fault depending on device policy.
- 2Define engineering value at 4 mA and at 20 mA for the measured variable.
- 3Solve linear relationship between mA and engineering units.
- 4Cross-check mid-scale points with a calibrator if disputes persist.
- 5Document alarm thresholds with the same scaling basis.
示例
- Tank level 4 mA empty, 20 mA full.
- Pressure transmitter with elevated zero.
应避免
- Using raw mA in SCADA without engineering conversion.
- Confusing square-root relationships for orifice DP without configuring properly.
- Ignoring square-root extraction done inside the device vs in software.
相关工具
博客
工程 中的更多内容
常见问题
HART digital values?
Digital PV may differ if secondary variables are addressed; verify which variable scales to mA.
Fault currents?
Some devices use <3.6 mA or >21 mA for fault; know your device.